top of page

Renovation Package Information

Demolition Service

Demolition of exiting bathroom areas getting ready for new tiles

Demolition of exiting kitchen areas getting ready for new tiles


*Demolition of the exiting bedroom wall to extend the master room 

(additional charges may apply)

Hacking of exiting floor at the kitchen/bathroom and living room 

Removal of old cabinet/sink/cookwares 



 

Electrical works

To supply labour and install lightings on exiting HDB points

*To supply labor and install air conditioning 
(Additional charges)



 

Door works

To install x2 Aluminum bi-fold door for bathroom

​

*Main door and gate upgrade 
(not within renovation package)

 

Masonry Works

To fabricate and install 50mm kitchen cabinet base

Lay wall tiles/ floor tiles in the bathroom area  


Lay floor tiles in the kitchen area 

Lay floor tiles in the living room 

​

*Please contact us for more detail on the tiles selection and package allowance. 

​

​

Carpentry Works

To design and fabricate 20ft kitchen cabinet with soft close hinges

​

To supply and install 10 ft kitchen quartz worktop 

​

To supply labour and install kitchen cookwares 

Miscellaneous

To discard construction waste after renovation

​

To clean up the unit upon project completion

To fulfill the unit owner's on-site requirement* 
(Achievable within package price)


 

Plumbing Works

To run the new pipeline for x2 bathroom

and kitchen 

To install kitchen sink taps and inlet/outlet pipes

To install the washing machine and washing basin taps

To supply labor to install x2 bathroom accessories
eg: heater / Sink 

Painting 

To supply and paint unit using Nippon 
  -Choices max 4 colors 

(Additional charges from the fifth color onwards)

 

 

To supply and paint door frames and pipes


 

Do not hesitate to contact us for more information 

bca.png
HDB-Logo_edited.jpg
bizSAFE-Enterprise-Level-3.jpg

All rights reserved © 2019 WanBang Construction 

bottom of page